
Electrical Panel Upgrades on Mercer Island
We size up the load first; if a new panel or bigger service is needed, we arrange the utility side and the inspection for you.
Have your panel sized up — (000) 000-0000The job
Does the Panel Have to Go?
Panels are changed when they are full, too small for what is planned, or from a brand with a poor record. Sizing up the load tells us which.
If your current panel can handle the new work, the estimate says so and the job is smaller.
When it does need replacing, we coordinate the utility disconnect so the outage is as short as it can be.
What we check first
What We Size Up
Current load
What the house uses now.
Planned load
Chargers, heat pumps, new kitchens.
Panel condition
Age, brand and any heat damage.
Service equipment
Meter base and service cable.
On site
Changeover Day
Disconnect
The utility cuts the service.
Replace
New panel fitted, circuits moved and labelled.
Reconnect
Inspection passed and power restored.
Want this one sized up?
A free in-home estimate gets you a written price built from your own house.